Last week I installed a junction box on the side of the cabin for the solar panels. The 8-3 wire from the utility room terminates in this box. I needed to finish running that wire before I could close up the loft ceiling.

Last Friday I picked up 900 sq. ft. of aspen T&G siding for the loft interior. We had some trouble loading the bundle onto the truck, resulting in a bent tailgate. We ended up hand loading the bundle, so in two days I unloaded the planks from the bundle, loaded them into the truck, and unloaded them into the cabin.

I more or less finished installing the siding on one gable end.

Junction box for the solar panels 8-3 wire from utility room Junction box for the solar panels Siding loaded in the truck Bent tailgate Siding stored in the cabin Siding stored in the cabin Siding stored in the cabin Siding installed on one wall Siding installed on one wall