The last four trips to the cabin were as follows:

  1. Clean up, organize, and move all the tools/supplies that were completely cluttering the first floor. Applied a final coat of joint compound on the downstairs walls.
  2. Sanded all the walls and ceiling. Applied a “slap brush” texture to the ceiling.
  3. Painted the ceiling and walls of the main room.
  4. Installed oak hardwood flooring in the main room.
Ceiling textured and painted. Moulding will cover the ceiling/wall joints. Walls are painted. Oak flooring being installed. Oak flooring installed. Oak flooring installed.