Utility Room and Random Other Things
Sunday, Oct 28, 2012
I want to finish some more outside work before the cold weather starts in earnest so I’ve started finishing the interior of the utility room. I wired up the AC electrical panel, added insulation, and started sheathing the inside walls with OSB. I framed in a ceiling with access to the “attic”. The “attic” is a very small space but provides a place to run wiring and piping more easily and neatly.
I also worked on a few other miscellaneous tasks. I installed the bathroom door, installed light fixtures in the living room and kitchen, and wired up some of the wall switches and sockets.

Plus there were birds attacking me the whole time (and eating the cabin). I ordered a fake owl to hopefully scare them away.