The last four trips to the cabin were as follows:

  1. Clean up, organize, and move all the tools/supplies that were completely cluttering the first floor. Applied a final coat of joint compound on the downstairs walls.

  2. Sanded all the walls and ceiling. Applied a "slap brush" texture to the ceiling.

  3. Painted the ceiling and walls of the main room.

  4. Installed oak hardwood flooring in the main room.