Category: Cabin

Downstairs Ceiling, Walls, and Flooring

The last four trips to the cabin were as follows:

  1. Clean up, organize, and move all the tools/supplies that were completely cluttering the first floor. Applied a final coat of joint compound on the downstairs walls.
  2. Sanded all the walls and ceiling. Applied a “slap brush” texture to the ceiling.
  3. Painted the ceiling and walls of the main room.
  4. Installed oak hardwood flooring in the main room.
Ceiling textured and painted. Moulding will cover the ceiling/wall joints. Walls are painted. Oak flooring being installed. Oak flooring installed. Oak flooring installed.

Loft Finish and Flooring

Saturday I put four coats of water-based polyeurethane on the loft siding. I used an Earlex HVLP sprayer I bought on sale about five years ago but hadn’t used until now. The sprayer worked great and it took about 25 minutes to spray a finish coat. Because I used water based poly, drying time between coats was only two hours.

While waiting for the finish to dry between coats I started on a porch ceiling using T&G aspen siding I had left over from the loft. While not strictly necessary, I had the extra wood and it does dress it up a bit. I got all the planks cut to size and about a third of it installed.

Sunday I installed flooring in the loft. I used a cork floating flooring I got for $2 a square foot. The dark color is called “Sable Gibralter” and provides a nice contrast to the lighter siding but does tend to show my dusty footprints.

Upon leaving on Sunday, I-40 was closed due to a fire seven miles SE of Heber so I had take an alternate route home which took me farther north through the towns of Tabiona, Hanna, and Francis. It was only 22 miles farther but the route contained a lot of steep grades and tight curves and because the big trucks had to detour also, I spent a lot of time going under 20mph. The trip home took an hour and 50 minutes.

View Larger Map

Spraying poly on the loft siding HVLP turbine sprayer Using extra siding for a porch ceiling Planks cut to length Using extra siding for a porch ceiling Installing the cork flooring Installing the cork flooring Installing the cork flooring Installing the cork flooring Installing the cork flooring Installing the cork flooring Installing the cork flooring Hauling tools/supplies back and forth is a drag Slow drive home

Loft Siding

I’ve finished installing the aspen siding in the loft. It took a bit longer than expected. Next I’ll add some finish and trim.

Loft Trim

Saturday I installed trim in the loft. I used cedar for the trim and the color matched the aspen siding very well. The windows took the longest but turned out well.

More Siding, More Rails, Tailgate, Rabbit

This week I mostly worked on the siding in the loft. I’m about 80% finished.

I also installed two more aluminum rails on the roof for solar panels. Originally I planned on installing two large 300W+ panels using the two rails but have since decided to use four somewhat smaller 200W+ panels, therefore the extra set of rails are required.

Minutia:

I found a new replacement Ford tailgate shell locally for $250. It’s already primed and I’m going to try painting it myself.

There’s a rabbit living in the pile of scrap wood by the cabin. He made an appearance on Saturday.

Loft siding - T&G aspen Loft siding - T&G aspen Loft siding - T&G aspen Two more solar panel mounting rails Four rails total New tailgate shell New tailgate shell Rabbit Rabbit